基于我国清单计价规范的Revit 模型工程量提取

  

  1. 西安建筑科技大学土木工程学院,陕西 西安 710055
  • 出版日期:2017-06-30 发布日期:2017-07-06
  • 基金资助:
    国家自然科学基金项目(51278400)

Extract Quantities of the Revit Model Based on China’s List Valuation Specification

  1. Civil Engineering College, Xi’an University of Architecture and Technology, Xi’an Shaanxi 710055, China
  • Online:2017-06-30 Published:2017-07-06

摘要: 工程算量的提取是基于BIM 的建设工程项目重要的环节,现有的算量软件(比如
广联达、鲁班)可对目前常用的建模软件Revit 模型导入其平台下算量,但部分模型数据可能会
丢失而且对转换模型和构件的名称等有严格要求,适用性较差。Revit 作为目前国内使用最为广
泛的BIM 软件之一,工程量的提取具有非常高的精度,但是其体积扣减规则和明细表功能并不
能满足我国《GB50500-2013_建设工程工程量清单计价规范》的要求。为实现基于Revit 平台工
程量提取的本地化,本文通过Revit 平台和Revit API,建立了BIM 预算模型,利用二次开发技
术对模型构件体积扣减规则重置,并按照相关规范进行构件编码,实现了项目工程量清单快速
准确的提取,验证了基于Revit 平台工程量提取本地化的可行性,提高了工程量计算的工作效
率和精度,减少材料浪费,降低了管理成本和预算风险。

关键词: 工程量清单, 重置体积扣减规则, 项目编码, 清单工具

Abstract: Quantities of extraction is an important part of the construction project based on BIM, The
existing engineering calculation software(such as Glodon and Luban)can import the Revit model into
its platform to calculate quantities, but part of the model data may be lost and there are strict
requirements for transformation of the model and the name of the component, poor applicability.
Revit as one of the currently most widely used BIM software, engineering extraction currently has a
very high accuracy but the volume of the deduction rules and schedule feature does not meet our
《GB50500-2013_construction engineering bill pricing norms》requirements. In order to realize the
localization of extraction of quantities based on the Revit platform, this paper used the Revit platform
and Revit API, established a budget BIM model, the use of the secondary development of model
components reset volume deduction rules and accordance coding member with the relevant parties to
achieve a rapid and exact the extraction of the bill of quantities, proved the feasibility of the localization
of extraction of quantities based on the Revit platform, improved the work efficiency and precision of
the calculation of quantities, reduced material waste, reduced management costs and budget risks.

Key words: bill of quantities, reset volume deduction rules, item codes, inventory