Welcome to Journal of Graphics share: 

Journal of Graphics

Previous Articles     Next Articles

Research on Business Process Reengineering of Project Management Based on BIM Visual Threshold

  

  1. 1. School of Management, Tianjin University of Technology, Tianjin 300384, China;
    2. College of Economics and Management, Guizhou Institute of Technology, Guiyang Guizhou 550003, China;
    3. Tianjin Company, China Construction Eighth Engineering Division, Tianjin 300452, China
  • Online:2017-12-30 Published:2018-01-11

Abstract: Aiming at the information integration of local block in the current stage of project
management and business process separates, cooperative project management problems such as
weakening the positive effect, taking a large public construction project in Tianjin as an example, the
information value chain theory is applied to process reengineering. The new process of scheduling
cost is divided into three parts: information input factor, information process factor and information
output factor in the BIM context. Then taking participants into the same process reengineering value
chain and integrating the information transmission link of various stages between all participants to
make up for the shortcomings of traditional business processes, to improve the efficiency of workflow
transformation and to save transaction cost.

Key words: BIM, process reengineering, information value chain, cost control, progress collaborative management