Journal of Graphics ›› 2023, Vol. 44 ›› Issue (4): 801-809.DOI: 10.11996/JG.j.2095-302X.2023040801
• BIM/CIM • Previous Articles Next Articles
CHEN Jing1(), YU Fang-qiang1(
), YI Si-kun2, QIU Chun-hua1, CAO Ying1
Received:
2022-10-31
Accepted:
2022-12-31
Online:
2023-08-31
Published:
2023-08-16
Contact:
YU Fang-qiang (1987-), senior engineer, Ph.D. His main research interests cover intelligent building, construction and operation and maintenance. E-mail:About author:
CHEN Jing (1989-), engineer, undergraduate. Her main research interests cover detail design on BIM, digital construction and other related content. E-mail:404191369@qq.com
Supported by:
CLC Number:
CHEN Jing, YU Fang-qiang, YI Si-kun, QIU Chun-hua, CAO Ying. Design and development of automatic drawing system for construction deepening based on BIM[J]. Journal of Graphics, 2023, 44(4): 801-809.
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.txxb.com.cn/EN/10.11996/JG.j.2095-302X.2023040801
基本函数名称 | 说明 |
---|---|
FilteredElementCollector (Document) | 构造一个新的FilteredElementCollector,将搜索和过滤文档中的元素集 |
FilteredElementCollector (Document, ElementId) | 构造一个新的FilteredElementCollector,将搜索和过滤视图中的可见元素, ElementId为视图的ID |
FilteredElementCollector (Document, ICollection<(Of <<'(ElementId>)>>)) | 构造一个新的FilteredElementCollector,将搜索和过滤一组指定的元素 |
ContainedInDesignOption | 添加一个设计选项DesignOption过滤 |
Table 1 The main method of FilteredElementCollector
基本函数名称 | 说明 |
---|---|
FilteredElementCollector (Document) | 构造一个新的FilteredElementCollector,将搜索和过滤文档中的元素集 |
FilteredElementCollector (Document, ElementId) | 构造一个新的FilteredElementCollector,将搜索和过滤视图中的可见元素, ElementId为视图的ID |
FilteredElementCollector (Document, ICollection<(Of <<'(ElementId>)>>)) | 构造一个新的FilteredElementCollector,将搜索和过滤一组指定的元素 |
ContainedInDesignOption | 添加一个设计选项DesignOption过滤 |
基本函数名称 | 说明 |
---|---|
Autodesk.Revit.Creation.ItemFactoryBase | 包括对齐、线型、角度、半径、直径、弧长的尺寸标注 |
NewAngularDimension(View, Arc, Reference, Reference) | 角度标尺的创建 |
Document.NewSpotElevation(View view, Reference ref, XYZ orgin, XYZ bend, XYZ end, XYZ refPt, bool hasLeader) | 高程点标注的创建 |
Table 2 The main method of NewDimension
基本函数名称 | 说明 |
---|---|
Autodesk.Revit.Creation.ItemFactoryBase | 包括对齐、线型、角度、半径、直径、弧长的尺寸标注 |
NewAngularDimension(View, Arc, Reference, Reference) | 角度标尺的创建 |
Document.NewSpotElevation(View view, Reference ref, XYZ orgin, XYZ bend, XYZ end, XYZ refPt, bool hasLeader) | 高程点标注的创建 |
分项 | 出图系统标准 | |
---|---|---|
文字 | 字体 | 长仿宋体、黑体 |
字高 | A2,A3,A4图幅:3.5 mm;A0,A1图幅:5.0 mm | |
比例 | 梁板图、墙柱图 | 1∶100 |
节点图 | 1∶20 | |
符号 | 剖切符号 | 由剖切位置线及剖视方向组成 |
索引符号 | 由直径为8~10 mm的圆和水平直径组成 | |
引出线 | 由水平方向直线与水平夹角成固定角度线组成 | |
标注 | 尺寸界线 | 由细实线绘制,应与被注长度垂直 |
尺寸线 | 由细实线绘制,应与被注长度平行 | |
起止符号 | 由粗斜短线绘制,长度宜2~3 mm | |
标高 | 由标高符号与数字组成 | |
图线 | 线型 | 可见轮廓线为实线;不可见轮廓线为虚线;轴线及中心线为点划线;分区为虚线; 断开界线为折断线或波浪线;其余一般为实线 |
线宽 | 轮廓线取1 mm;不可见轮廓线取0.7 mm;轴线及中心线取0.25 mm;分区取0.7 mm; 断开界线取0.25 mm;其余一般取0.25 mm | |
颜色 | 每个分项结构构件、图例标识均保证有独立可分辨颜色 | |
图例 | 洞口 | 由折线绘制,折线与洞口形状应形成封闭图形并填充 |
升降板填充 | 不同标高填充使用不同样式图形 |
Table 3 Drawing system view template standard
分项 | 出图系统标准 | |
---|---|---|
文字 | 字体 | 长仿宋体、黑体 |
字高 | A2,A3,A4图幅:3.5 mm;A0,A1图幅:5.0 mm | |
比例 | 梁板图、墙柱图 | 1∶100 |
节点图 | 1∶20 | |
符号 | 剖切符号 | 由剖切位置线及剖视方向组成 |
索引符号 | 由直径为8~10 mm的圆和水平直径组成 | |
引出线 | 由水平方向直线与水平夹角成固定角度线组成 | |
标注 | 尺寸界线 | 由细实线绘制,应与被注长度垂直 |
尺寸线 | 由细实线绘制,应与被注长度平行 | |
起止符号 | 由粗斜短线绘制,长度宜2~3 mm | |
标高 | 由标高符号与数字组成 | |
图线 | 线型 | 可见轮廓线为实线;不可见轮廓线为虚线;轴线及中心线为点划线;分区为虚线; 断开界线为折断线或波浪线;其余一般为实线 |
线宽 | 轮廓线取1 mm;不可见轮廓线取0.7 mm;轴线及中心线取0.25 mm;分区取0.7 mm; 断开界线取0.25 mm;其余一般取0.25 mm | |
颜色 | 每个分项结构构件、图例标识均保证有独立可分辨颜色 | |
图例 | 洞口 | 由折线绘制,折线与洞口形状应形成封闭图形并填充 |
升降板填充 | 不同标高填充使用不同样式图形 |
对比项 | 工作流程 | 所用工时(min) | 工时汇总(min) |
---|---|---|---|
传统深化 绘图工作 | 梳理需要出图的楼层相关的所有设计图纸, 包括梁图、板图、墙柱图、节点详图等 | 30 min | 约1 800 min (约3~4个工作日) |
选取设计图纸中基本建筑构造图线作为深化图纸底图, 一般水平向构件图选取梁图或板图中基本构造图线, 竖向构件图选取墙柱图中基本构造图线 | 30 min | ||
绘制水平向平面图。提取设计图中梁、板尺寸、定位、标高、 板洞等工程信息,并在底图中绘制出,包括标注、符号及填充 | 约50 m2/min,本项目地下 两层约用时1 000 min | ||
绘制垂直竖向构件图。提取设计图中墙、柱尺寸、定位、标高、 墙洞等工程信息,并在底图中绘制出,包括标注、符号及填充 | 约100 m2/min,本项目地下 两层约用时500 min | ||
图纸深化,结合机电图纸绘制留洞图 | 240 min | ||
出图系统 自动绘图 | 读取模型楼层及族 | 5 min | 约20 min |
选择需要生成的图纸种类并出图 | 约3 500 m2/min,本项目地下 两层约用时15 min |
Table 4 Comparison between traditional drawing method and automatic drawing system
对比项 | 工作流程 | 所用工时(min) | 工时汇总(min) |
---|---|---|---|
传统深化 绘图工作 | 梳理需要出图的楼层相关的所有设计图纸, 包括梁图、板图、墙柱图、节点详图等 | 30 min | 约1 800 min (约3~4个工作日) |
选取设计图纸中基本建筑构造图线作为深化图纸底图, 一般水平向构件图选取梁图或板图中基本构造图线, 竖向构件图选取墙柱图中基本构造图线 | 30 min | ||
绘制水平向平面图。提取设计图中梁、板尺寸、定位、标高、 板洞等工程信息,并在底图中绘制出,包括标注、符号及填充 | 约50 m2/min,本项目地下 两层约用时1 000 min | ||
绘制垂直竖向构件图。提取设计图中墙、柱尺寸、定位、标高、 墙洞等工程信息,并在底图中绘制出,包括标注、符号及填充 | 约100 m2/min,本项目地下 两层约用时500 min | ||
图纸深化,结合机电图纸绘制留洞图 | 240 min | ||
出图系统 自动绘图 | 读取模型楼层及族 | 5 min | 约20 min |
选择需要生成的图纸种类并出图 | 约3 500 m2/min,本项目地下 两层约用时15 min |
分项 | 评价内容 | 评分标准 | 项目评分 | 评分说明 |
---|---|---|---|---|
图面美观性 (20分) | 图纸布局视图比例合理 | 5 | 5 | 基于出图系统预制视图样板,图面美 观性得到保证 |
文字大小合理、字体清晰易辨识 | 5 | 5 | ||
线型线宽符合标准,对可见轮廓与不可见轮廓 区别表示;填充轮廓线易辨识 | 5 | 5 | ||
标注显示美观、避让重叠 | 5 | 5 | ||
图面信息完 整性(40分) | 构件基本尺寸及定位信息完整 | 7 | 7 | 此部分检查主要针对出图系统的功能, 除部分非正交构件的定位标注取 参照点位置有误之外,其余完成度 较好 |
升降构件标高信息完整,且带有填充 | 7 | 7 | ||
特殊标注如非正交构件定位信息完整 | 7 | 4 | ||
重点图例如洞口、弧形构件完整标识 | 7 | 7 | ||
平立剖详图对应关系准确 | 5 | 5 | ||
图面无其他标注缺漏 | 7 | 5 | ||
图面(模型) 深度(40分) | 构件基本尺寸及定位信息准确 | 7 | 6 | 此部分检查结合模型准确性检查以及 出图系统功能检查,主要检查: ①模型准确性;②出图系统对异形 构件的准确识别 |
升降构件标高信息准确 | 7 | 7 | ||
特殊标注如非正交构件定位信息准确 | 7 | 4 | ||
重点图例如洞口、弧形构件尺寸标注信息准确 | 7 | 7 | ||
异形节点平面剖面准确标注 | 5 | 3 | ||
图面引出线标注内容信息准确 | 5 | 5 | ||
图面无明显模型缺漏导致的图纸信息缺漏 | 2 | 1 | ||
合计 | 100 | 88 |
Table 5 Drawing evaluation criteria
分项 | 评价内容 | 评分标准 | 项目评分 | 评分说明 |
---|---|---|---|---|
图面美观性 (20分) | 图纸布局视图比例合理 | 5 | 5 | 基于出图系统预制视图样板,图面美 观性得到保证 |
文字大小合理、字体清晰易辨识 | 5 | 5 | ||
线型线宽符合标准,对可见轮廓与不可见轮廓 区别表示;填充轮廓线易辨识 | 5 | 5 | ||
标注显示美观、避让重叠 | 5 | 5 | ||
图面信息完 整性(40分) | 构件基本尺寸及定位信息完整 | 7 | 7 | 此部分检查主要针对出图系统的功能, 除部分非正交构件的定位标注取 参照点位置有误之外,其余完成度 较好 |
升降构件标高信息完整,且带有填充 | 7 | 7 | ||
特殊标注如非正交构件定位信息完整 | 7 | 4 | ||
重点图例如洞口、弧形构件完整标识 | 7 | 7 | ||
平立剖详图对应关系准确 | 5 | 5 | ||
图面无其他标注缺漏 | 7 | 5 | ||
图面(模型) 深度(40分) | 构件基本尺寸及定位信息准确 | 7 | 6 | 此部分检查结合模型准确性检查以及 出图系统功能检查,主要检查: ①模型准确性;②出图系统对异形 构件的准确识别 |
升降构件标高信息准确 | 7 | 7 | ||
特殊标注如非正交构件定位信息准确 | 7 | 4 | ||
重点图例如洞口、弧形构件尺寸标注信息准确 | 7 | 7 | ||
异形节点平面剖面准确标注 | 5 | 3 | ||
图面引出线标注内容信息准确 | 5 | 5 | ||
图面无明显模型缺漏导致的图纸信息缺漏 | 2 | 1 | ||
合计 | 100 | 88 |
[1] | 陶桂林, 马文玉, 唐克强, 等. BIM正向设计存在的问题和思考[J]. 图学学报, 2020, 41(4): 614-623. |
TAO G L, MA W Y, TANG K Q, et al. Problems with and reflections on BIM forward design[J]. Journal of Graphics, 2020, 41(4): 614-623 (in Chinese). | |
[2] | HU Z Z, LENG S, LIN J R, et al. Knowledge extraction and discovery based on BIM: a critical review and future directions[J]. Archives of Computational Methods in Engineering, 2022, 29(1): 335-356. |
[3] | 秦雯, 陈威, 计晓萍. 基于BIM的结构出图[J]. 土木建筑工程信息技术, 2013, 5(2): 92-95. |
QIN W, CHEN W, JI X P. Plot structural drawing based on BIM[J]. Journal of Information Technology in Civil Engineering and Architecture, 2013, 5(2): 92-95 (in Chinese). | |
[4] |
YIN M T, TANG L, ZHOU T Y, et al. Automatic layer classification method-based elevation recognition in architectural drawings for reconstruction of 3D BIM models[J]. Automation in Construction, 2020, 113: 103082.
DOI URL |
[5] |
ZHAO Y F, DENG X Y, LAI H H. Reconstructing BIM from 2D structural drawings for existing buildings[J]. Automation in Construction, 2021, 128: 103750.
DOI URL |
[6] | 黄静菲, 赖华辉, 邓雪原. 基于IFC标准的施工图注释自动生成方法研究[J]. 图学学报, 2017, 38(5): 760-766. |
HUANG J F, LAI H H, DENG X Y. Research on automated generation of annotations for construction drawings based on IFC standard[J]. Journal of Graphics, 2017, 38(5): 760-766 (in Chinese). | |
[7] |
DENG M, TAN Y, SINGH J, et al. A BIM-based framework for automated generation of fabrication drawings for facade panels[J]. Computers in Industry, 2021, 126: 103395-103410.
DOI URL |
[8] | 胡振中, 陈祥祥, 王亮, 等. 基于BIM的管道预制构件设计技术与系统研发[J]. 清华大学学报: 自然科学版, 2015, 55(12): 1269-1275. |
HU Z Z, CHEN X X, WANG L, et al. BIM-based design method for prefabricated pipeline components[J]. Journal of Tsinghua University: Science and Technology, 2015, 55(12): 1269-1275 (in Chinese). | |
[9] |
DENG M, GAN V J L, TAN Y, et al. Automatic generation of fabrication drawings for façade mullions and transoms through BIM models[J]. Advanced Engineering Informatics, 2019, 42: 100964.
DOI URL |
[10] | 杨海涛, 李冰. 桥梁构件BIM正向出图技术的研究与应用[J]. 中国市政工程, 2021(5): 65-69, 118. |
YANG H T, LI B. Research & application of BIM forward drawing technology of bridge components[J]. China Municipal Engineering, 2021(5): 65-69, 118 (in Chinese). | |
[11] | 杜林宝, 黄学良, 王彦伟, 等. 工业建筑预埋件三维快速装配设计方法[J]. 图学学报, 2012, 33(3): 90-96. |
DU L B, HUANG X L, WANG Y W, et al. A 3D rapid assembly design method for embedded part of industrial building[J]. Journal of Graphics, 2012, 33(3): 90-96 (in Chinese). | |
[12] | 张远艳, 赵心莹, 陈欢. BIM模式下二维图纸输出研究[J]. 吉林建筑大学学报, 2021, 38(1): 74-78, 88. |
ZHANG Y Y, ZHAO X Y, CHEN H. Research on outputting 2D blueprint under BIM model[J]. Journal of Jilin Jianzhu University, 2021, 38(1): 74-78, 88 (in Chinese). | |
[13] | 李桐. Revit MEP管道自动标注及优化布置算法的研究[D]. 西安: 西安建筑科技大学, 2016. |
LI T. Revit MEP pipeline automatic labeling and research of algorithm of optimal placement[D]. Xi’an: Xi’an University of Architecture and Technology, 2016 (in Chinese). | |
[14] | 王亮. CAD建筑制图标准与应用分析[J]. 中国标准化, 2016(15): 37, 39. |
WANG L. CAD architectural drawing standards and application analysis[J]. China Standardization, 2016(15): 37, 39 (in Chinese). |
[1] | GAO Ge1,2, ZHANG Yue-mei1,2, LIU Han1,2, LI Zhi3, GU Ming1,2 . Research on IFC Model Checking Method Based on Knowledge Base [J]. Journal of Graphics, 2019, 40(6): 1099-1108. |
[2] | HOU Wen-long, DENG Xue-yuan . Automatic Generation Method of Dimension Annotating for Floor Plane Based on IFC Standard [J]. Journal of Graphics, 2019, 40(6): 1116-1122. |
[3] | LIU Ying-hua1,2,3, XIE Lin-lin1,4, LI Ai-qun1,4, HOU Miao-le1,2,3, LIU Hao-yu1,2,3 . Multi-LoD Expression and Automatic Information Integration of Cracks in Ancient Wooden Buildings [J]. Journal of Graphics, 2019, 40(6): 1123-1129. |
[4] | WANG Xue-wei, SHENG Bu-yun, ZHANG Yun, LIU Yuan-zhi . Research on Automatic Labeling Method of Architectural Aluminum Formwork Installation Drawing [J]. Journal of Graphics, 2019, 40(6): 1130-1136. |
[5] | WANG Ru, QUAN Chao-chao . Research on Fast and Accurate Modeling Method of BIM Parameterization for Highway Interchange [J]. Journal of Graphics, 2019, 40(4): 766-770. |
[6] | ZHANG Chao . 4D-BIM Based Quality and Safety Management for Qugang Highway [J]. Journal of Graphics, 2019, 40(4): 778-782. |
[7] | JIANG Shaohua, WU Zheng, WANG Na, JIANG Liping, HAN Yunwei . Review of OpenBIM and Its Engineering Application [J]. Journal of Graphics, 2018, 39(6): 1139-1147. |
[8] | WU Songfei, DENG Yichuan, SHEN Qiyu, LUO Dehuan . A Review on Research and Applications of BIM-Based Construction Safety Compliance Checking [J]. Journal of Graphics, 2018, 39(6): 1156-1164. |
[9] | WEI Xing, JU Yunhua . Teaching and Practice Reform of Steel Structure Bridge Based on BIM+VR Technology [J]. Journal of Graphics, 2018, 39(6): 1231-1238. |
[10] | LENG Shuo1, HU Zhenzhong2 . A Review of BIM-Based Artificial Intelligence Methods [J]. Journal of Graphics, 2018, 39(5): 797-805. |
[11] | Present and Future of Integrated Applications of BIM, Cloud Computing, Big Data and Internet of Things . Present and Future of Integrated Applications of BIM, Cloud Computing, Big Data and Internet of Things [J]. Journal of Graphics, 2018, 39(5): 806-816. |
[12] | GUI Ning1, GE Danni1, MA Zhiliang2 . Researches and Applications of Cloud-Based BIM Architectures [J]. Journal of Graphics, 2018, 39(5): 817-828. |
[13] | ZHENG Ming, XUE Qiaorui, WEI Wei, XU Zhen . A Review on the Research Using Building Information Model Technology in Multi-Hazards Topic [J]. Journal of Graphics, 2018, 39(5): 829-834. |
[14] | JIANG Shaohua, WU Zheng . Research on Cloud Storage and Retrieval Method of BIM Spatial Relational Data [J]. Journal of Graphics, 2018, 39(5): 835-842. |
[15] | ZHONG Wei1, ZHANG Kaile1, YANG Gangying2, NIE Fengya3. Research on Business Process Reengineering of Project Management Based on BIM Visual Threshold [J]. Journal of Graphics, 2017, 38(6): 896-903. |
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||