欢迎访问《图学学报》 分享到:

图学学报

• 建筑与城市信息模型 • 上一篇    下一篇

基于图论的建筑机电设备逻辑关系自动提取方法

  

  1. (上海建工四建集团有限公司,上海 201103)
  • 出版日期:2020-04-30 发布日期:2020-05-15
  • 基金资助:
    上海市青年科技英才扬帆计划项目(18YF1410400)

Automatic extraction method of logic relationship of electromechanical  device based on graph theory

  1. (Shanghai Construction No.4 (Group) Co. LTD, Shanghai 201103, China)
  • Online:2020-04-30 Published:2020-05-15

摘要: 随着建筑信息模型(BIM)在建筑施工及运维阶段的深入应用,建筑机电设备的逻辑 关系自动提取成为进一步应用的瓶颈。针对建筑机电系统信息模型应用过程中逻辑连接关系应 用需求高、判断复杂的问题,提出了一种基于图论的建筑机电设备逻辑关系自动提取方法。基 于 BIM,将机电系统抽象为无向连通图,连接器抽象为图的边,机电设备、管道、管道附件等 抽象为图的节点,将一片管道抽象为管道团,将设备与大量管道的复杂连接转换为设备到几个 管道团的简单连接,从而将机电系统逻辑关系自动生成的问题转换为无向连通图求解的问题, 建立了机电构件物理连接关系提取方法、设备逻辑连接关系自动生成和设备连接路径计算方法, 实现了建筑机电系统逻辑关系快速、准确、智能的提取。该方法在工程中的实施有利于基于 BIM 的机电系统运营维护管理,有利于实现建筑的全生命期信息管理。

关键词: 建筑信息模型, 机电设备, 逻辑关系, 连接路径, 图论, 运维

Abstract:  With the in-depth application of building information modeling (BIM) in the phrases of construction, operation and maintenance, the automatic extraction of logical relationship of building electromechanical devices has become a bottleneck for further application. This article proposes an automatic extraction method of logic relationship of electromechanical system based on graph theory. First, the electromechanical system was abstracted as a non-directional connected graph base on the BIM model, and the connector was abstracted as the edge of the graph. Then, the devices, pipelines and pipeline attachments were abstracted as the nodes of the graph. Next, a flat of pipelines were abstracted as a pipeline cluster so that the complex connection could be converted into a simple connection from the device to several pipe clusters. Finally, the problem of automatically generating the logical relationship was changed into the problem of solving the undirected connected graph. This article established a method of extracting the physical connection relationship of electromechanical components, automatically generating logical relations and calculating connection path of devices. In this way, the logical relations can be extracted fast, accurately and intelligently. In addition, the implementation of this method in engineering is beneficial to the operation and maintenance management of electromechanical system based on BIM.

Key words:  building information modeling, electromechanical device, logical relation, connecting path, graph theory, operation maintenance