欢迎访问《图学学报》 分享到:

图学学报

• 建筑与城市信息模型 • 上一篇    下一篇

建筑机电系统物理连接关系自动修复方法

  

  1. (上海建工四建集团有限公司,上海 201103)
  • 出版日期:2020-10-31 发布日期:2020-11-05
  • 通讯作者: 许璟琳(1989),女,福建漳州人,工程师,硕士。主要研究方向为计算机辅助建筑物运维管理。E-mail:xujinglin510@163.com
  • 基金资助:
    上海市青年科技英才扬帆计划项目(18YF1410400);上海市启明星课题(18QB1402300)

Method for automatically repairing physical connection relationship of electromechanical system

  1. (Shanghai Construction No.4 (Group) Co. Ltd., Shanghai 201103, China)
  • Online:2020-10-31 Published:2020-11-05
  • Contact: XU Jing-lin (1989–), female, engineer, master. Her main research interests cover computer-aided building operation and maintenance management. E-mail:xujinglin510@163.com
  • Supported by:
    Shanghai Sailing Program (18YF1410400); Shanghai Rising-Star Program (18QB1402300)

摘要: 建筑机电设备逻辑关系自动提取成为建筑信息模型(BIM)从施工向运维阶段应用的 关键技术要点之一。针对实际工程项目 BIM 模型中设备、管线之间的物理连接错误、缺漏较多、 自动化提取设备逻辑连接关系难度高等问题,提出了建筑机电系统物理连接关系自动修复和效 率优化的方法。针对跨文件连接断点、错位连接、连接方向错误等 3 类问题进行准确定义,提 出自动检查和修复方法,能够自动快速修复现有 BIM 模型中常见的物理连接大量缺失的问题。 该方法在工程的实施支持施工 BIM 模型向运维 BIM 模型的快速转化,有利于实现基于 BIM 的 机电系统运维维护管理。

关键词: 建筑信息模型, 机电设备, 物理连接, 连接器, 逻辑关系, 运维

Abstract: The automatic extraction of logical relations of building electromechanical equipment has become one of the key technical points for the application of building information modeling (BIM) from construction to operation & maintenance. In view of the problems in actual engineering projects of BIM models, such as physical connection errors, large numbers of missing points, and the difficulty in automatically extracting the logical connection, a method of automatic repair and efficiency optimization for the physical connection relationship of the building electromechanical system was proposed. Accurate definitions were given in terms of three types of problems, such as cross-file connection breakpoints, misaligned connections, and wrong connection directions. The method for automatic inspection and repair was proposed to fix the problem of the large number of missing physical connections commonly found in existing BIM models. The implementation of this method in projects supported the rapid conversion of the BIM model from construction to operation & maintenance, which was conducive to the implementation of the BIM-based operation & maintenance management of the electromechanical system.

Key words: building information modeling, electromechanical device, physical connection, connector, logical relation, operation & maintenance