欢迎访问《图学学报》

图学学报 ›› 2026, Vol. 47 ›› Issue (5): 1115-1124.DOI: 10.11996/JG.j.2095-302X.2026051115

• 建筑与城市信息模型 • 上一篇    下一篇

基于大模型的审图规则结构化转译研究

刘寅, 许璟琳, 辛佩康()   

  1. 上海建工四建集团有限公司, 上海 201103
  • 收稿日期:2026-04-27 接受日期:2026-07-31 出版日期:2026-10-31 发布日期:2026-10-26
  • 通讯作者:辛佩康,E-mail:2285037917@qq.com
  • 基金资助:
    上海市东方英才计划青年项目(QNKJ2024047);上海市促进产业高质量发展专项(2025-GZL-RGZN-01030)

Research on structured translation of design review rules based on LLM

LIU Yin, XU Jinglin, XIN Peikang()   

  1. Shanghai Construction No. 4 (Group) Co., Ltd., Shanghai 201103, China
  • Received:2026-04-27 Accepted:2026-07-31 Published:2026-10-31 Online:2026-10-26
  • Contact: XIN Peikang,E-mail:2285037917@qq.com
  • Supported by:
    Youth Project of the Shanghai Oriental Talents Program(QNKJ2024047);Special Fund for Promoting High-Quality Industrial Development of Shanghai(2025-GZL-RGZN-01030)

摘要:

面向深化设计阶段图纸会审记录口语化、语义模糊、术语不统一、上下文依赖强及工程经验难复用等问题,构建一种将非结构化工程文本稳定转化为可计算审图规则的结构化转译方法,以降低专家手工编写规则的成本并提高经验沉淀效率。以建筑信息模型(BIM)审查需求为约束,设计由审查主体、审查属性、逻辑算子和阈值或客体对象组成的规则四元组;构建面向非标准术语的语义字典,将工程习惯表达映射到工业基础类(IFC)实体和属性;依次执行文本清洗、BIM可检性判定、四元组拆解、语义消歧、可计算功能匹配和结构化自然语言(SNL)实例化,并利用融合思维链的大语言模型(LLM)提示架构完成分阶段推理和结果自检。从企业历年图纸会审记录中筛选200条样本,由5名工程专家编制人工基准,另由10名资深工程师在匿名条件下按可检性、构件名称、构件属性、逻辑算子和SNL规范性5项指标独立评分,对比简单提示词通用模型组与融合思维链组,并记录不同复杂度样本的质量与处理耗时。融合思维链组5项指标得分率分别为98.0%,91.7%,91.3%,92.0%和94.3%,较通用模型组分别提高27.0,34.4,38.6,33.6和43.9个百分点;简单、常规和复杂样本得分率分别达到97.3%,93.9%和86.6%,复杂样本的改善幅度更明显。全部样本推理约耗时1.5 h,虽高于通用模型组约20 min,但显著低于人工基准构建的约50人时。受控语义槽位、领域语义字典、SNL模板与分阶段思维链协同,可提升图纸会审记录转译的一致性、规范性和效率,为工程经验向可复用审图规则的数字化沉淀提供可实施路径参考。

关键词: 建筑信息模型, 深化设计, 大语言模型, 规则转译, 思维链, 自动合规性审查

Abstract:

Drawing review records generated during detailed design are often colloquial. Their semantic ambiguity, inconsistent engineering terminology, and strong dependence on drawing context make engineering experience difficult to reuse. The objective was to develop a structured translation method that converts unstructured engineering text into computable drawing-review rules, reduces the cost of manual rule authoring, and improves the efficiency of accumulating reusable engineering experience. Building Information Modeling (BIM) checking requirements were used as the operational constraint. Each candidate rule was represented as a quadruple comprising a review subject, a review attribute, a logical operator, and a threshold or object value. A domain semantic dictionary was constructed to align colloquial and nonstandard construction terms with Industry Foundation Classes (IFC) entities, and attributes. The implementation workflow contained six connected stages. First, raw records were cleaned, irrelevant meeting information was removed, separated questions and replies were merged, and compound entries were divided into minimal issue units. Second, BIM checkability was determined for each unit or requiring human judgment according to the availability of explicit objects, geometric relations, measurable attributes, spatial constraints, or existence requirements. Third, BIM-checkable units were decomposed into the four semantic slots while preserving thresholds, units, reference objects, and uncertainty markers. Fourth, extracted entities and properties were disambiguated using the semantic dictionary and IFC terminology; ambiguous matches were retained as candidates for review. Fifth, the logical operator was matched to available computational functions for attribute, spatial, and existence constraints. Sixth, the completed slots were instantiated as Structured Natural Language (SNL) statements with prerequisite conditions and executable checking clauses. A Large Language Model (LLM) prompt architecture incorporating chain-of-thought reasoning was used for staged reasoning and self-checking of results. Two hundred samples were selected from the company’s historical drawing review records. Five experienced engineers created the expert reference answers. A separate panel of ten senior engineers independently scored anonymized outputs for BIM checkability, component naming, component attributes, logical operators, and SNL conformity. A general-model group using a simple prompt was compared with the proposed chain-of-thought-enhanced group under the same base-model environment. The chain-of-thought-enhanced group obtained score rates of 98.0% for checkability, 91.7% for component names, 91.3% for component attributes, 92.0% for logical operators, and 94.3% for SNL conformity. Compared with the general-model group, the corresponding gains were 27.0, 34.4, 38.6, 33.6, and 43.9 percentage points. The largest improvement occurred in SNL conformity, indicating that the coordinated use of the semantic dictionary, rule quadruple, computational-function constraints, and staged prompts substantially reduced uncontrolled expression. Score rates for simple, routine, and complex samples were 97.3%, 93.9%, and 86.6%, respectively. The improvement was more pronounced for complex samples. Processing all 200 samples required approximately 20 minutes for the general-model group and 1.5 hours for the enhanced group. Processing by the enhanced group remained markedly faster than expert reference construction, which required approximately 50 person-hours, or more than 10 hours with five experts working in parallel. Coordinating controlled semantic slots, a domain semantic dictionary, SNL templates, and staged reasoning can improve the consistency, conformity, and practical efficiency of translating drawing review records into reusable BIM checking rules. The workflow provides an implementable route for converting dispersed engineering experience into structured digital assets while retaining uncertainty and manual-review flags.

Key words: building information modeling, detailed design, large language model, rule translation, chain-of-thought, automated compliance checking

中图分类号: